MySB
Close Panel

Ortega Park Master PlanPlanning Central

Project Description

The project consists of the Ortega Park Master Plan, including demolition of existing facilities and construction of a new swimming pool, wading pool, water slide, skate park, splash pad, sports courts, shade sails, sports field with synthetic turf, ping pong tables, cornhole, and buildings for restrooms and maintenance. On-site improvements such as fencing, parking, landscaping, dumpsters and related enclosures, and internal walkways are also proposed. Right-of-way improvements including street parking, parking medians, and sidewalk installation are proposed. Front setback modifications to allow parking within the front setbacks along both Ortega Street and Salsipuedes Street are required. Planning Commission review of the proposed skate park for consistency with Community Park amenities is required. The park is considered a Community Park (except the ballfields and related facilities), a Sports Facility (for the ballfields and related facilities only), and a Community Building (the Welcome House) per City Council Resolution 17-074. The parcel is zoned P-R, with a General Plan designation of Parks and Open Space.

Contact

Stephanie Swanson, Associate Planner
(805) 564-5470 x4562
SSwanson@SantaBarbaraCA.gov

Documents

Notice of Intent
Mitigated Negative Declaration

Attachments

Attachment 1 - Project Plans (Architectural)
Attachment 1 - Project Plans (Civil)
Attachment 2 - Conditions
Attachment 3 - Applicant Letter
Attachment 4 - Memo from Nathan Slack
Attachment 5 - ABR Minutes
Attachment 6 - CalEMOD data
Attachment 7 - Site Assessment Report
Attachment 8 - Soil Management Report
Attachment 9 - EHS Conditional Approval Letter
Attachment 10 - Noise Analysis
Attachment 11 - Sewer and Water Demand Study
Attachment 12 - Onsite Stormwater Report
Attachment 13 - Offsite Stormwater Report

Last Updated: Oct 14, 2020
Top of Page