The project would demolish the existing 4,655 square feet (s.f.) bridge deck and replace it with a 2,740 s.f. bridge deck. The south side of the new bridge deck would be supported on piles and a foundation behind the existing sandstone abutment. The north side of the new bridge would be supported by a new abutment that would be located in the same location as the existing sandstone wall. The new bridge would provide one vehicular lane in each direction and a five foot sidewalk on each side. New bridge railings and approaches to the bridge would be constructed.
Review the Case Status for MST2010-00263.
Kathleen Kennedy
Associate Planner
(805) 564-5470, x4560
kkennedy@santabarbaraca.gov
Mail comments to:
City of Santa Barbara Planning Division
PO Box 1990
Santa Barbara, CA 93102-1990