MySB
Close Panel
Click for weather info59°F

Stay Informed

Newsletter Logo

What’s happening with this project? Subscribe here to receive notifications.

Westside Bike Boulevard Gap Closure Project

Why this Project?

The Westside neighborhood of Santa Barbara has a propensity for walking and biking - yet it needs connections to make active transportation safe and easy. In the Project study area, between 2011 and 2015, 35 people were injured walking or biking, including one fatality.

The neighborhood lacks bike facilities and a safe and efficient crosstown connection. As a result, cyclists bike along busy Micheltorena Street, where they must share the road with traffic. Micheltorena carries over 6,800 vehicles per day. Although the Project is intended to create a safe, efficient cycling route, pedestrians will also benefit from traffic control changes, with new traffic signals near Downtown creating safer crossings.

The Westside Bike Boulevard Project emerged from several neighborhood summits and the Bicycle Master Plan (2016), and is in line with the City's Vision Zero Strategy (2018). The Project will establish safe and efficient connections from the Westside to schools, parks, and Downtown. It will also create a connected crosstown bike network by connecting to the Eastside Bike Lanes and Sidewalk Upgrades Project. These connections will be safer and more accessible, whether you choose to walk or bike. Find out more about the Project below.

 Project Overview PDF

What's Happening

News Image

Westside Transportation Safety Listening Workshop Held

April 8, 2019 

To identify walking, biking, and driving safety concerns in Santa Barbara’s Westside and Lower West Neighborhoods, City Public Works held a Listening Workshop on April 6, 2019. The gathering was held at Harding Elementary, with residents and interested parties discussing areas of concern within their neighborhoods.

Read More »

News Image

“Westside Connects” Project Set to Kick Off in 2019

March 1, 2019 

The Westside Bike Boulevard Gap Closure Project emerged from community input in the Bicycle Master Plan (2016), and is in line with the City’s Vision Zero Strategy (2018). The Project was awarded $4.5 million in grant funding from the state’s Active Transportation Program in 2017.

Read More »

Last Updated: Apr 25, 2019
Top of Page