Projects in ProgressYour Local Sales Tax at Work

  • Business Corridor Improvements
    To fund the ongoing maintenance of the downtown business corridor in order to support a clean and vibrant downtown business district. Project includes sidewalk paver maintenance, curb painting, sign maintenance, graffiti abatement, street lighting maintenance, and maintenance of improvements located in the public right-of-way. (Fiscal Year 2020 Measure C Approved Budget - $250,000)
  • Cabrillo Pavilion
    The purpose of the project is to restore the Cabrillo Pavilion as a viable community recreation center that serves Santa Barbara residents and visitors and returns the building to its original status as the "crown jewel of East Cabrillo Boulevard." (Fiscal Year 2020 Measure C Approved Budget - $4,559,752)
  • Central Library - Roof, Gutter, and Eave Replacement
    To replace sloped tile roof and gutters at Central Library. (Fiscal Year 2020 Measure C Approved Budget - $85,000)
  • Eastside Library Minor Renewal
    Facility renewal including roof, paint, interior finishes, and mechanical, electrical, and plumbing upgrades. (Fiscal Year 2020 Measure C Approved Budget - $235,000) 
  • Fire Station 2 - Minor Renewal
    Facility renewal including roof, paint, interior finishes, and mechanical, electrical, and plumbing upgrades. (Fiscal Year 2020 Measure C Approved Budget - $210,000)
  • Fire Station 3 Minor Renewal
    Facility renewal including roof, paint, interior finishes, and mechanical, electrical, and plumbing upgrades. (Fiscal Year 2019 Measure C Approved Budget - $84,937)
  • Fiscal Year 2019-B Pavement Maintenance Projects
    Annual pavement maintenance includes the sealing of cracks, slurry seal, asphalt overlay, reconstruction, or other methods as appropriate to maintain an acceptable driving surface.  (Fiscal Year 2019 Measure C Approved Budget - $12,675,000)
  • Los Banos Boiler Replacement
    Replacement of the boiler at Los Banos Pool.  (Fiscal Year 2020 Measure C Approved Budget - $190,436)   
  • Mission Street Pavement Maintenance Project
    The project will improve pedestrian accessibility along the corridor by upgrading 12 access ramps to meet ADA requirements and repairing sections of sidewalk. The pedestrian crossings at the Mission/De La Vina intersection will also be shortened, making this intersection easier for pedestrians to navigate. (Fiscal Year 2020 Approved Budget - $1,000,000)
  • Street Lighting Improvements
    This is an annual program to fund new mid-block streetlights and the replacement of existing streetlights (as needed due to knockdowns) with City standard street light poles and fixtures. (Fiscal Year 2020 Measure C Approved Budget - $371,000)
  • Traffic Signal Upgrades
    This project maintains public safety and reduced traffic congestion by performing maintenance to keep traffic signals operating reliably. (Fiscal Year 2020 Measure C Approved Budget - $620,000)
Last Updated: Sep 13, 2019