  • Cabrillo Pavilion
    The purpose of the project is to restore the Cabrillo Pavilion as a viable community recreation center that serves Santa Barbara residents and visitors and returns the building to its original status as the "crown jewel of East Cabrillo Boulevard."
  • Fiscal Year 2019-A Pavement Maintenance Projects
    Annual pavement maintenance includes the sealing of cracks, slurry seal, asphalt overlay, reconstruction, or other methods as appropriate to maintain an acceptable driving surface.  (Fiscal Year 2019 Measure C Approved Budget - $12,675,000)
  • Fiscal Year 2019-B Pavement Maintenance Projects
    Annual pavement maintenance includes the sealing of cracks, slurry seal, asphalt overlay, reconstruction, or other methods as appropriate to maintain an acceptable driving surface.  (Fiscal Year 2019 Measure C Approved Budget - $12,675,000)
  • Mission Street Pavement Maintenance Project
    The project will improve pedestrian accessibility along the corridor by upgrading 12 access ramps to meet ADA requirements and repairing sections of sidewalk. The pedestrian crossings at the Mission/De La Vina intersection will also be shortened, making this intersection easier for pedestrians to navigate. (Fiscal Year 2019 Approved Budget - $1,000,000)
  • Fire Station 3 Minor Renewal
    Facility renewal including roof, paint, interior finishes, and mechanical, electrical, and plumbing upgrades. (Fiscal Year 2019 Measure C Approved Budget - $295,000)
  • Fire Station 4 Minor Renewal
    Facility renewal including roof, paint, interior finishes, and mechanical, electrical, and plumbing upgrades. (Fiscal Year 2019 Measure C Approved Budget - $230,000)
  • Fire Station 5 Minor Renewal
    Facility renewal including roof, paint, interior finishes, and mechanical, electrical, and plumbing upgrades. (Fiscal Year 2019 Measure C Approved Budget - $240,000)
  • Eastside Library Minor Renewal
    Facility renewal including roof, paint, interior finishes, and mechanical, electrical, and plumbing upgrades. (Fiscal Year 2019 Measure C Approved Budget - $235,000)      

 

Last Updated: Jun 27, 2019