MySB
Close Panel
Click for weather info71°F

Public Works News DetailPublic Works

Temporary Closure of El Camino De la Luz Pedestrian Bridge

$0Temporary Closure of$0El Camino De La Luz Pedestrian Bridge$0$0In December 2013$0$0               $0$0$0$0November 2013 - The Public Works Department’s Engineering Division is planning to complete sewer main rehabilitation work underneath the El Camino De La Luz Pedestrian Bridge, located between El Camino De La Luz and La Mesa Park.  The work will begin in early December 2013, and end approximately December 20, 2013.  Work hours will be Monday through Friday, from 7:00 A.M. to 5:00 P.M. During the construction, nearby residents may experience minor construction noise, but access to residents’ driveways will not be impacted.$0$0During construction, it will be necessary to close the bridge to pedestrian traffic; however, to assist with the closure: $0$01.    Pedestrian and bicyclist detours will be posted in the surrounding areas of the project.$0$02.    Bridge closure signs will also be posted in advance at each end of the bridge.$0$03.    Nearby residents along El Camino De La Luz will be notified by the contractor 72 hours in advance of the start of construction.$0$0Thank you for your patience while we make the repairs necessary to provide residents with reliable sewer service.$0$0If you have questions regarding the project, please contact Heidi Braunger, Project Engineer, at (805) 897-1902. Información en español es disponible al (805) 897-2615.$0

Last Updated: Oct 8, 2013