MySB
Close Panel
Click for weather info53°F

Facilities Planning and Development

Owen Thomas
Supervising Engineer
OThomas@SantaBarbaraCa.gov
805-692-6018Picture of Owen Thomas, Airport Facilities

Leif Reynolds 
Project Engineer
LReynolds@SantaBarbaraCa.gov
805-692-6020

 

 

Andrew Bermond, AICP
Project Planner
ABermond@SantaBarbaraCa.gov
805-692-6032

The Facilities Planning & Development Division is responsible for design, permitting, and construction of Airport infrastructure and buildings.

Planning Documents

Airport Layout Plan (2015)

Draft Airport Master Plan (2014)

Draft Santa Barbara County Airport Land Use Compatibility Plan (2012)

2014-2019 Capital Improvement Program (2013)

Airport and Goleta Slough Coastal Plan (2003)

Goleta Slough Ecosystem Management Plan (1997)

Special Studies

Goleta Slough Inlet Modeling Study

Permit Applications

City of Santa Barbara Planning Central

 

Goleta Slough Access Permit

FAA Obstruction Evaluation/Airport Airspace Analysis (Form 7460) 



Last Updated: Feb 1, 2016