MST Number: MST2010-00263 Click on link for Case Status
Contact:
Michael Berman, Environmental Analyst
MBerman@SantaBarbaraCA.gov
(805) 564-5470, X4558
City of Santa Barbara Planning Division
P.O. Box 1990
Santa Barbara, CA 93102-1990
Project Description: The project would demolish the existing 4,655 square feet (s.f.) bridge deck and replace it with a 2,740 s.f. bridge deck. The south side of the new bridge deck would be supported on piles and a foundation behind the existing sandstone abutment. The north side of the new bridge would be supported by a new abutment that would be located in the same location as the existing sandstone wall. The new bridge would provide one vehicular lane in each direction and a five foot sidewalk on each side. New bridge railings and approaches to the bridge would be constructed.
Documents:
· Notice of Intent
· Draft Mitigated Negative Declaration and Initial Study, dated 07-13-11
Reference Sources:
· Arcadis, Natural Environmental Study, dated December 2010
· Arcadis, Biological Assessment, dated 12-10-10
· Applied Earthworks, Memorandum Historical Resources Evaluation, dated 08-26-10
· Applied Earthworks, Historical Resources Evaluation Report, dated September 2010
· Fugro, Preliminary Foundation Report, dated 03-18-10
· RGA Environmental, Asbestos and Lead Sampling Report, dated 09-09-10