MST Number: MST2009-00536 Click on link for Case Status
Contact:
Kelly Brodison, Assistant Planner
KBrodison@SantBarbaraCA.gov
(805) 564-5470, X4531
City of Santa Barbara Planning Division
P.O. Box 1990
Santa Barbara, CA 93102-1990
Project Description: The project consists of a proposal to construct a 40-unit Residential Care Facility for the Elderly (RCFE) designed to serve seniors suffering from Alzheimer’s or various forms of dementia. Proposed construction includes a two-story, 24,128 square foot building with a 2,210 square foot sub-level cellar for food storage, laundry and mechanical equipment. The first and second floors would be 8,581 and 13,337 net square feet, respectively. The project includes 20 on grade parking spaces, of which 16 are covered and 4 are uncovered. The existing structures on site consist of three houses (two of which are duplexes), two garages and one shed totaling 8,251 net square feet and are proposed to be demolished. There is an existing oak tree that is proposed to be preserved and included as part of the new site plan.
A total of 11,228 net square feet of floor area on the first and second floors would be dedicated to residential rooms, which range from 294 to 376 square feet in size. Each room would have a private sink, a studio living/bedroom area, and in most cases would share a bathroom with the adjacent room. Common amenities total 10,690 square feet, and include a commercial kitchen, dining area, wellness center, activity spaces, sunrooms, bathrooms and service areas. Individual units do not have kitchens or kitchenettes, and would not qualify as traditional “dwelling units.”
Documents:
· Notice of Intent
· Notice of Public Hearing
· Final Mitigated Negative Declaration and Initial Study, dated September 15, 2011
· Exhibit A: Project Plans (Includes Open Space Exhibit 6.14.2011)
· Exhibit B: Mitigation Monitoring and Reporting Program, dated June 23, 2011
· Exhibit C: Architectural Board of Review Meeting Minutes, dated May 17, June 1, and July 12, 2010
· Exhibit D: Arborist Reports, Dated March 2009 and August 2010
· Exhibit E: Historic Sites/Structures Report, dated October 29, 2007
· Exhibit F: Environmental Noise Study, dated October 28, 2010
· Exhibit G: Traffic Analysis, dated August 18, 2011
· Exhibit H: Preliminary Drainage Analysis , dated August 4, 2010
· Exhibit I: Assisted Living Land Use Description
· Exhibit J: Operational/Staffing Plan
· Exhibit K: FMND Response to Comments, dated September 15, 2011