Seal of the Santa Barbara - [Link to Home Page]
 
Site Map >>
Contact Us >>
Seal of the City of Santa Barbara - [Link to Home Page] City of Santa Barbara Collage City of Santa Barbara Collage City of Santa Barbara Collage City of Santa Barbara Collage City of Santa Barbara Collage City of Santa Barbara Collage City of Santa Barbara Collage

City Calendar
dotline
Community & Neighborhood
dotline
Environmental Documents
dotline
Health & Human Services
dotline
Home & Property
dotline
Libraries & Schools
dotline
Licenses, Permits & Inspections
dotline
Major Planning Efforts
dotline
Measure G
dotline
Office of Emergency Services
dotline
Recreation & Sports
dotline
Safety
dotline
SB City Vote
dotline
Things to Do
dotline
Transportation & Parking
dotline
Water, Waste, Recycling & Utilities
dotline
Water Resources
dotline

  
     
   1298 Coast Village Road
  
  
  

The project consists of the demolition of an existing gas station with two repair bays and the construction of a new mixed use building. The new 18,196 square foot mixed use building would be comprised of eight residential condominiums and approximately 5,000 square feet of commercial space, located on the ground floor. All of the residential units would be located on the second and third floors. Five residential units would include two bedrooms, two units would include one bedroom each and one unit would include three bedrooms. 38 parking spaces would be provided, with nine covered parking spaces located at grade level and 29 parking spaces located below grade. Grading would be approximately 9,500 cubic yards of cut and 1,500 cubic yards of fill.

Documents

·           1298 Coast Village Road Draft Initial Study

·           1298 Coast Village Road Draft Negative Declaration

·           Exhibit A Project Plans

·           Exhibit B Applicable General Plan Policies

·           Exhibit C View Study

·           Exhibit D Architectural Board of Review Minutes November 14 2005

·           Exhibit E Planning Commission Minutes 04.07.05 and 02.16.06

·           Exhibit F Arborist Report 06.01.06

·           Exhibit G Remediation Quarterly Status Report 11.09.06

·           Exhibit H Preliminary Acoustical Study December 2006

·           Exhibit I Traffic and Circulation Study 09.28.06

 





Click Here for a Printer Friendly Version of this Page  Printer Friendly Version